Both the 8’x10’ metal storage shed in back and the 10’ x 16’ St. Pauly clothing shed at the edge of the parking lot are in place and in use.
We approved spending about $150 for a 2’x3’ outdoor direction sign pointing the way to key functions (services, offices, ministries) in both church buildings. The graphic design and sign material are being finalized.
A trial 4’x8’ panel was mounted on our property along the I-190. It was found that the view from the road was unobstructed over an adequate distance, but the sign, of the max allowable size, appears quite small. The next step is to attach trial lettering to determine its readability.
We decided to award a $13,000 contract to A-Best Roofing to re-roof both sides of the gym. Though only one side was damaged by wind, the other side is in poor condition. We expect our insurance to cover $6000 of the cost.
Necessary painting in the parsonage and porch are well underway. A detailed plan has been developed for the many final housekeeping tasks, but vacation plans etc are impacting volunteer signups.