Projects Completed:
Don Mason re-tubed the boiler at HT; no cost to Trinity.
Tri-Lock secured all corner shingles on HT Bell tower, no additional cost.
Rob installed protective and attractive enclosure for water heater in HT kitchen
Contracted for snowplowing ($4,450) and salting ($170 each, after first)
Installed energy-efficient fluorescent tubes and ballasts in main church and gym ($2964)
Bought gasoline powered hedge trimmer ($270)
Bought two lightweight 6’ tables and two 8’ tables ($240)
Approved donation to Fire Company ($100)
Projects Planned or In Work:
Replace all old zone valves at HT ($2600, shared 50/50 with HT Committee)
Install an 8x10 metal shed near dumpster, for gas grill and snow blower storage ($400)
Provide a small shed for garbage cans at “youth house” ($200)
Install a lockset in door from DD room to Nursery, as requested by Nursery attendant
Add safe sanctuary windows in five doors in main church building
Exploring installation of a 4’x 8’ TRINITY sign on our property near I-190
Exploring replacement of front sign (in driveway) with a programmable led type.
Investigating cost-effectiveness of outsourcing lawn and cemetery mowing.